Skip to content

Marine Parade & Triton Ave Pavement Rehabilitation – RainSmart®

Facebook
LinkedIn
Twitter
WhatsApp

Project Details

Contractor

Higgins Contractors Ltd

Client

Tauranga City Council

Engineer

Opus International Consultants Ltd

Location

Marine Parade & Triton Avenue Mt Maunganui, Tauranga

Cirtex Regional Contact

Darren Clare

Darren Clare

Project Information

Cirtex supplied the tanks in CKD form to save freight costs and the contractors assembled them at their premises to save time on site. Installation is simple with clear instructions, and the RainSmart system does not require large quantities of aggregate to facilitate the design such as tunnel systems do, further reducing costs on site.

These included 95% void space, high strength and the Linear Access System which substantially reduces tank sedimentation as the contaminants collect in the sumps and can be readily cleaned out as required, maintaining the integrity of the system as a soakage and storage facility.

Products used in this Project

Please note:

Cirtex stocks the Triton S22 Chambers. When using the calculator, please ensure you change 'chamber selection' to S-22.

RainSmart Assembly Guides

5 Plate Modules

RainSmart Assembly Guides

4 Plate Modules